
Opening of the 4th phase (Swimming Pool, Sports Fields, Saunas, Amphitheatre)
October 10, 2025
VR Krtsanisi Resort Residence opened the fourth phase of the project, which includes an innovative 45-meter swimming pool with a sand beach and imitation of sea waves, as well as sports fields, wet an...
VR Krtsanisi Resort Residence opened the fourth phase of the project, which includes an innovative 45-meter swimming pool with a sand beach and imitation of sea waves, as well as sports fields, wet and dry saunas, an amphitheatre, and several recreational areas.
The event was attended by the residents of VR Krtsanisi Resort Residence, who can use the given infrastructure.
Move to VR Krtsanisi Resort Residence and live in a comfortable environment.

youtube
Location
Merab Kostava str. 37/39
Grigol Volski str. N7